St. George’s Church of England Foundation School provides an innovative and challenging learning environment that is totally dedicated to seeking and developing the potential of every young person. However, inadequate facilities were proving a hindrance to the pupil’s education.View full case study
Client: Date Commenced on Site: Location: |
|
DDS Demolition has been commissioned by the London Borough of Ealing to undertake the complete asbestos removal, strip out and demolition of The Kipling Tower as part of an ongoing regeneration project. DDS were awarded the contract after a stringent tender submission procedure. The complex prequalification and tender processes were enforced to ensure client certainty whilst allocating the most suitable contractor for the works View full case study
Client: Date Commenced on Site: Location: |
|
DDS were contracted by Barrett Eastern Counties to undertake, demolition and site clearance works to the Former Bell Language School in Essex. The site comprised of several buildings of varying construction, including: two storey load bearing brick construction with timber floors and framed roof, a single storey timber framed building with timber cladding and pitched roof. In addition, the main building entailed three stories and was of reinforced concrete construction with concrete slabs and clad with aluminum panels. A basement extended beneath the building due to changes in ground level across the site. All structures were to be demolished down to under side of slab, foundations broken out and removed. View full case study
Client: Date Commenced on Site: |
|
DDS undertook works for Pfizer, one of the worlds leading pharmaceutical companies, dismantling and demolishing three buildings of various compositions. The sensitive nature of undertaking works for a pharmaceutical company was given constant consideration from commencement; DDS successfully completed the works with the professionalism employed on all contracts. View full case study
Client: Date Commenced on Site: Location: |
|
DDS Demolition undertook phase four of a consolidation scheme extending over two years for Smurfit Kappa Townsend Hook, at their Paper Mill in Snodland Kent. This phase involved the complete demolition of the Ream and Palette store, located less than a metre away from the Maidstone to London railway line. The structures were constructed of timber, brick, concrete and steelwork; over ninety eight percent of which underwent recycling and further processing via our sister company TW Services. View full case study
Client: Date Commenced on Site: Location: |
|
The project brief was to demolish a small 19th century house and out buildings, reclaim any reusable building materials that could be reused in the new development and clear the site of its shrubbery.
The site its self was very sensitive as it lay with in a conservation area and area of outstanding natural beauty in the quiet village of Lower Hardres and was subject to various planning appeals. It became evident from the outset that it was very important for our client that none of the conditions were breeched or any local residences were unnecessarily affected. View full case study
Client: Date Commenced on Site: Location: |
|
DDS kick off the commencement of St Regis's £104 million project at their Kemsley Mill site in Sittingbourne , Kent , demolishing and stripping out various area's to make way for the insulation of their new process tank farm.
Client: Date Commenced on Site: Location: |
DDS undertook the partial demolition and strip-out works within Charles Dickens school. The school remained live at the time of operation, therefore DDS was responsble, and made suitable provisions for the health and safety of the students.